250 MW Dual-Fuel Combined Cycle Power Plant (KPC-II) Environmental and Social Impact Assessment Report in Karachi has been undertaken by K-Electric to ensure environmental compliance and sustainable development. The ESIA
The Coal Transshipment Project will be developed by Huaneng Fuyun Port & Shipping (Pvt.) Limited, a joint venture between Huaneng Shandong Ruyi (Pakistan) Energy (Pvt.) Limited (HSRE) and Qingdao Old
EIA report evaluates the establishment of a 330 MW lignite coal-fired mine-mouth power plant by Thar Energy Limited in Thar Block II, Sindh. Located in the Thar Desert, the coalfields
EIA report covers the installation of a T-Off Tower at the existing Dhabeji-Gharo Circuit and a 5.7 km overhead transmission line connecting to Oursun’s solar power plant along the Sindh