Forums Booklet Water Supply Situation in Karachi On 03 July 2008, the Urban Resource Center hosted a forum titled “Water Supply Situation in Karachi: Issues, Priorities, and Read more
Forums Booklet Gutter Baghicha On 31 January 2006, the Urban Resource Center hosted a forum titled “Gutter Baghicha,” with Nisar Baloch as the speaker. Read more
Climate Change Karachi Parks and Playgrounds Survey Karachi Parks and Playgrounds Survey, this report presents the findings of a quantitative survey focused on the public parks and Read more
Climate Change Parks and Playgrounds News Database (2008-2015) Parks and Playgrounds News Database (2008-2015) Compiled by Tazeen Saleem, Zainab Fatima, Zaffar Abbas, and Abdullah as part of their Read more
EIA Reports 250 MW KPC-II Power Plant – ESIA Report 250 MW Dual-Fuel Combined Cycle Power Plant (KPC-II) Environmental and Social Impact Assessment Report in Karachi has been undertaken by Read more
EIA Reports Coal Transshipment Project of Port Qasim – EIA Report The Coal Transshipment Project will be developed by Huaneng Fuyun Port & Shipping (Pvt.) Limited, a joint venture between Huaneng Read more
EIA Reports Thar Coalfields Power Plant – EIA Report EIA report evaluates the establishment of a 330 MW lignite coal-fired mine-mouth power plant by Thar Energy Limited in Thar Read more
EIA Reports Dhabeji-Gharo Circuit Interconnection – EIA Report EIA report covers the installation of a T-Off Tower at the existing Dhabeji-Gharo Circuit and a 5.7 km overhead transmission Read more
EIA Reports Port Qasim Transmission Line – EIA Report Transmission Lines at Port Qasim EIA Report details a three-component project to strengthen Karachi’s power transmission infrastructure. The plan includes Read more
EIA Reports Interconnection Scheme at Dhabeji-Gharo – EIA Report Interconnection Scheme at Dhabeji-Gharo Circuit outlines the proposed installation of a 0.6 km overhead transmission line. This line will link Read more