Parks and Playgrounds News Database (2008-2015) Compiled by Tazeen Saleem, Zainab Fatima, Zaffar Abbas, and Abdullah as part of their summer internship at NED University of Engineering & Technology in
250 MW Dual-Fuel Combined Cycle Power Plant (KPC-II) Environmental and Social Impact Assessment Report in Karachi has been undertaken by K-Electric to ensure environmental compliance and sustainable development. The ESIA
The Coal Transshipment Project will be developed by Huaneng Fuyun Port & Shipping (Pvt.) Limited, a joint venture between Huaneng Shandong Ruyi (Pakistan) Energy (Pvt.) Limited (HSRE) and Qingdao Old
EIA report evaluates the establishment of a 330 MW lignite coal-fired mine-mouth power plant by Thar Energy Limited in Thar Block II, Sindh. Located in the Thar Desert, the coalfields