The Bahria Town Icon Tower, EIA Report outlines the environmental assessment of a multi-use high-rise building project in Clifton, Karachi. The project consists of a 60-storey commercial tower, with 59
Barge Mounted Power Generation Project is a rental power project designed to generate 231.8 MW of electricity through two powerships mounted with engines operating on heavy fuel oil (HFO) and
Proposed Compact Steel Plant EIA study has been conducted by Environmental Management Consultants (EMC) on behalf of M/s ASG Metals Limited (AML). The plant will be established on a 50-acre
Korangi Thermal Power Station, Capacity Enhancement Project EIA Report presents the Social and Environmental Impact Assessment (SEIA) for a 220 MW capacity enhancement at the Korangi Thermal Power Station (KTPS),
HESCO 6th STG Project Environmental and Social Assessment focuses on enhancing the efficiency, reliability, and quality of electricity supply within the Hyderabad Electric Supply Company (HESCO) network. The 6th Secondary
Dry Laundry Plant at Port Qasim is the subject of this Environmental Impact Assessment (EIA) report, which details Procter & Gamble Pakistan’s (P&GP) plan to establish its first dry laundry
Proposed 100 MW Wind Power Project – EIA Report examines the environmental and socio-economic aspects of developing a wind energy facility by NBT Wind Power Pakistan (Pvt.) Ltd. Located in
This Environmental Impact Assessment report evaluates the proposed 132 kV Hybrid Grid Station and its associated transmission lines at Block-16, Gulistan-e-Jauhar, Karachi. The project aims to reduce load on the