On 31 January 2006, the Urban Resource Center hosted a forum titled “Gutter Baghicha,” with Nisar Baloch as the speaker. The forum focused on the challenges facing Gutter Baghicha, a
Karachi Parks and Playgrounds Survey, this report presents the findings of a quantitative survey focused on the public parks and playgrounds of Karachi. It explores the critical role these recreational
Parks and Playgrounds News Database (2008-2015) Compiled by Tazeen Saleem, Zainab Fatima, Zaffar Abbas, and Abdullah as part of their summer internship at NED University of Engineering & Technology in
250 MW Dual-Fuel Combined Cycle Power Plant (KPC-II) Environmental and Social Impact Assessment Report in Karachi has been undertaken by K-Electric to ensure environmental compliance and sustainable development. The ESIA
The Coal Transshipment Project will be developed by Huaneng Fuyun Port & Shipping (Pvt.) Limited, a joint venture between Huaneng Shandong Ruyi (Pakistan) Energy (Pvt.) Limited (HSRE) and Qingdao Old
EIA report evaluates the establishment of a 330 MW lignite coal-fired mine-mouth power plant by Thar Energy Limited in Thar Block II, Sindh. Located in the Thar Desert, the coalfields
EIA report covers the installation of a T-Off Tower at the existing Dhabeji-Gharo Circuit and a 5.7 km overhead transmission line connecting to Oursun’s solar power plant along the Sindh
Transmission Lines at Port Qasim EIA Report details a three-component project to strengthen Karachi’s power transmission infrastructure. The plan includes establishing a 220 kV grid station in Pir Sarhandi Goth
Interconnection Scheme at Dhabeji-Gharo Circuit outlines the proposed installation of a 0.6 km overhead transmission line. This line will link a newly proposed T-Off Tower at the existing BOC-Dhabeji Circuit—near